English / GlobalRobotic dresspack systems · Wuhan, China
For integrators · distributors · robot OEMsWhatsApp +86 139 7117 6101
Public record 06 / Specialist

Two hose paths, one moving envelope

A specialist thermoplastic placement and winding application recorded with a 48 + 70 dual-hose Series 4 telescopic route on a Comau N-170-3.0.

Two hose paths, one moving envelope
Record summary

A specialist thermoplastic placement and winding application recorded with a 48 + 70 dual-hose Series 4 telescopic route on a Comau N-170-3.0.

LocationWuhan, Hubei
ProcessAFPT thermoplastic placement / winding
RobotComau N-170-3.0 · several
Configuration48 + 70 dual-hose Series 4 telescopic
Public record: this page is a reference for the interface conversation. It does not publish a customer name, price, contract, complete BOM or proprietary project drawing.
Project context

What made this record useful.

The public value is not a part number. It is the combination of a robot family, a process environment and a route architecture that can be discussed with the people who will install and maintain the line.

CityWuhan, Hubei
Client typeEquipment manufacturer (anonymized)
ProcessAFPT thermoplastic placement / winding
RobotComau N-170-3.0 · several
Dresspack record48 + 70 dual-hose Series 4 telescopic
Record dateTBC
DisclosurePublic fields; customer identity withheld
Engineering focus

The questions this record raises.

  • Dual-hose separation and bend radius
  • Thermal exposure around the tool
  • Telescopic storage through the winding path
  • Access for inspection and replacement
Path to a new project

From a public record to a released interface.

01

Read the public record

Start with the robot, process and configuration. Do not infer a diameter or bracket geometry from the record alone.

02

Map the duty

Reconstruct the actual tool cycle, the high-risk zone and the inspection window for the new project.

03

Check the envelope

Use the real robot model and tool to check anchors, bend radius and collision through the full motion.

04

Release the interface

Agree the drawing, BOM and service route before a trial installation or batch release.

Verification frame

What must be checked before handover.

  • Interface: flange, fixed points and tool-side connection do not interfere through the full cycle.
  • Bend radius: the assembled bundle stays within its allowed minimum radius.
  • Motion margin: maximum extension does not pull tight; minimum retraction does not stack the bundle.
  • Protection: the outer structure covers the high-risk zone and leaves the inspection path open.
  • Fasteners: anchors and brackets are checked for dynamic load and access.
  • Maintenance: the wear part, inspection interval and replacement path are documented for handover.
Related routes

Open the system or application behind this record.

Same process, different robot?

Use the record as a question, not an answer.

Share the model and the motion. We will tell you what changes.