English / GlobalRobotic dresspack systems · Wuhan, China
For integrators · distributors · robot OEMsWhatsApp +86 139 7117 6101
Series 06 / Body-following route

Hug the body. Keep the access.

A body-following C-flange architecture for projects where the route must stay close to the robot and remain easy to open, inspect and replace.

System overview

A body-following C-flange architecture for projects where the route must stay close to the robot and remain easy to open, inspect and replace.

The series number is a routing decision, not a product grade. Start with the motion and environment, then let the model, bundle and service access narrow the geometry.

RouteBody-followingC-flange
ConduitProjectbundle-led
OuterCloth + springlayered cover
ProtectionIP54connector rating
Fit check

Start here when — and stop when.

Good starting point

  • Space around the robot body is tight and a conventional bracket would create an unsupported loop.
  • The route needs to stay close to the arm and clear the tool or fixture.
  • The outer cover must be opened, inspected or replaced without dismantling the whole bundle.
  • Spot welding or handling needs a body-following route with a defined service method.

Not the first answer

  • A universal C-flange is being ordered without the exact robot body and mounting surface.
  • Heavy impact protection is required but no local reinforcement is included.
  • Temperature, chemical exposure or cleaning method has not been checked against the outer material.
  • The maintenance opening is hidden behind the tool or fixture.
Core data

Specification boundary.

Conduit diameterNo fixed diameter; selected from the project bundle and bend radius
Connector protectionIP54
Body materialFire-resistant cloth + protective spring
StructureC-flange shaped around the robot body
Typical dutiesSpot welding, handling, compact installation and maintenance-led projects
Fixing basisRobot body contour, flange position, available mounting surface and tool clearance
Project releaseBody-following drawing, outer-layer specification, BOM and inspection plan
Release note: values describe the series-level interface. Project parameters, bracket geometry and final BOM are confirmed against the robot model and complete motion envelope.
Design logic

Three things the drawing has to answer.

01 / FOLLOW

Follow the body contour.

The route should reduce unsupported distance without rubbing on the casting or trapping the cable between covers.

02 / LAYER

Separate protection from structure.

The outer cloth and spring are a working layer; the cable bundle and bend radius remain the internal design constraint.

03 / OPEN

Design the maintenance action.

Decide how the cover is opened, how the cable is inspected and how a worn section is replaced before the drawing is released.

Selection sequence

Five checks before a drawing is released.

01

Step 01

Confirm the robot body shape, flange location and usable mounting surface.

02

Step 02

Measure the cable/hose bundle, count and minimum bend radius.

03

Step 03

Run the full envelope and check C-flange clearance to the body, tool and fixture.

04

Step 04

Confirm the outer material for temperature, wear and cleaning conditions.

05

Step 05

Set the outer-cover inspection and replacement procedure.

Series boundary

When this series is not enough.

Series 6 is a project-specific structure. Strong impact may still require a barrel review or local reinforcement, and every robot body shape needs its own flange and clearance check.

Questions

Ask before you commit.

Why is there no fixed diameter?

The structure follows the robot body and the cable bundle. Capacity is set by the project bundle and bend radius, not by a single standard conduit size.

Does the C-flange fit every robot?

No. The flange, mounting surface and body contour must be reviewed for each robot brand and model.

Does the outer cloth need replacement?

It is a working layer and should be inspected for temperature damage, spatter, wear and cleaning exposure. Replacement depends on the actual duty.

Can Series 6 be combined with another system?

Yes. A rotary or telescopic element may be added elsewhere, but the full assembly still needs one envelope and service review.

Next step

One model. One envelope. One useful answer.

If the robot code is known, we can skip the generic kit conversation and start with the interface.