English / GlobalRobotic dresspack systems · Wuhan, China
For integrators · distributors · robot OEMsWhatsApp +86 139 7117 6101
Robotic dresspack systems / integrator-first

Your robot.Our interface.

We engineer cable and hose routing around the robot, the tool and the way your line moves. Start with a known model; confirm the route in CAD before anything is released.

10 robot brands mapped84 model references29 / 36 / 48 / 70 mm
01 / INTERFACEEN / 2026
Robot coverage01
10

robot brands in the public model map

Model families02
40

base robot families with reference configurations

Architectures03
06

dresspack systems, one selection logic

Conduit sizes04
29–70

four internal diameters, in millimetres

The shortest path

From robot model to an installable route.

No catalog-only answer. Each step narrows the interface until the drawing, BOM and wear-part reference can be checked by the people who will install it.

01 / ROBOT

Start with the code.

Brand, base model, payload, reach, controller and tool-centre constraints.

02 / MOTION

Map the wrist.

J3/J4 anchors, wrist rotation, tool changes and the complete motion envelope.

03 / BUNDLE

Size the bundle.

Cable and hose count, outer diameter, minimum bend radius and moving mass.

04 / RELEASE

Release the interface.

3D interference check, 2D drawing, BOM and a serviceable wear-part route.

For integrators & distributors

Make the interface easier to sell, install and repeat.

We work as an engineering extension to your integration team: a model-specific reference, a drawing path and a route that can be serviced after commissioning.

Build a partner brief
01 / Fit

Model-level review

Send the exact robot code and tool interface. We check the wrist, anchors and envelope — not just the brand name.

02 / Speed

Drawing path

Initial CAD direction same day; 2D drawing target within 48 hours once the inputs are complete.

03 / Range

OEM & neutral supply

Private-label and neutral-packaging requirements can be discussed programme by programme.

04 / Export

Documentation pack

English catalogues, drawings, packing data and order documents aligned to the shipment.

Before the RFQ

The facts you can check before you ask for a price.

The public model map is a reference, not a release. Use it to identify the robot family and the likely route, then send the exact model and the part of the motion that is difficult.

10 robot brands mapped84 public references6 series29 / 36 / 48 / 70 mm
Read the engineering notes
Can you match ABB, FANUC, KUKA and other robot brands?

The public map covers 10 robot brands and 84 reference configurations. It can identify the closest series and process reference, but the exact variant, tool and J3/J4 fixing points still need a model-level review.

Which series should I start with?

Start with the motion and protection problem: fixed route, wrist rotation, long stroke, spatter, compact storage or body-following geometry. The six series represent different answers, not a product ladder.

What should I include in the first brief?

The exact robot code, tool or changer, cable and hose list, wrist photos and a motion clip if available. The form keeps six required fields and lets you add optional notes.

Are the certificate files public?

Yes. The resources page links the public CE attestation, ISO 9001, ISO 14001, ISO 45001 and RoHS files. The PDF and its printed scope remain the controlled source.

Can you support OEM and neutral supply?

The route, packaging and document set can be discussed programme by programme. MOQ, lead time, branding and regional terms are confirmed in the commercial agreement, not inferred from this public site.

Bring the hard part

Send the robot code. We will start there.

One form, six required fields. Add the tool, cable list and motion clip if you have them; we will tell you what is missing.